Sie sehen gerade einen Platzhalterinhalt von Standard. Um auf den eigentlichen Inhalt zuzugreifen, klicken Sie auf den Button unten. Bitte beachten Sie, dass dabei Daten an Drittanbieter weitergegeben werden.
Weitere InformationenGrease Separators: general inspection and maintenance in Büdingen
Are you in need of a comprehensive inspection and maintenance service for your grease separator in Bad Nauheim?
It's a legal requirement that separator systems undergo a thorough inspection before commissioning. These systems are also required to undergo a subsequent general inspection every five years. We can provide you with the services of a qualified inspector who will be on hand to ensure that all relevant standards and guidelines are in place in accordance with government requirements.
In order to maintain the grease separators effectively, the following maintenance schedules must be adhered to:
- Minimum once a month: Self-inspection by a qualified person.
- At least bi-annually: Maintenance check by an approved inspector.
- At least once every five years: General inspection by an accredited inspector.
How to reach us
We are pleased to advise you
More than 1,000 customers rely on the expertise of Abfluss-AS Büdingen. Do you too? Get in touch with us.